August 22, 2023. I stopped at the house to drop off tiles that had been delivered. Pleased to see there had been lots of progress since my last visit.
More: The balcony wall is now covered with a pieces of metal that match the windows. There are shelves next to the bathroom sink. The water heater was delivered but not yet installed. The port-a-potty was being taken away when I arrived.
This entry was posted on August 22, 2023 at 1:04 pm and is filed under Uncategorized. You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.
One Response to “Concrete Floor in the Garage and More”
Thanks for the update. The light fixture, front porch, and kitchen doors look great. We can’t wait to see it in person. How fortunate to have the 2 air conditioners—a mistake by someone to your benefit?
August 23, 2023 at 1:51 am
Thanks for the update. The light fixture, front porch, and kitchen doors look great. We can’t wait to see it in person. How fortunate to have the 2 air conditioners—a mistake by someone to your benefit?