Concrete Floor in the Garage and More

August 22, 2023. I stopped at the house to drop off tiles that had been delivered. Pleased to see there had been lots of progress since my last visit.

The concrete floor of the garage has been poured and was being smoothed when I was there.
Much of the electrical has been installed. This light in the style of Frank Lloyd Wright is at the top of the stairs; this is the one that K-san said would be the “main character”. The breaker box is in, as are most of the lights and the outlets.
Louvered sliding doors hide the shelves in the kitchen.
The front steps now are covered.
The air conditioner was being installed when I arrived. They guys were outside working on the heat exchanger. I had a moment of panic — I thought they’d installed the unit in the wrong place. When I contacted the developer, they informed us we were getting two units instead of the expected one unit. It was supposed to be a surprise, but I kind of ruined the surprise with my panic.

More: The balcony wall is now covered with a pieces of metal that match the windows. There are shelves next to the bathroom sink. The water heater was delivered but not yet installed. The port-a-potty was being taken away when I arrived.

One Response to “Concrete Floor in the Garage and More”

  1. Anonymous Says:

    Thanks for the update. The light fixture, front porch, and kitchen doors look great. We can’t wait to see it in person. How fortunate to have the 2 air conditioners—a mistake by someone to your benefit?